STEP BY STEP GUIDE FOR YOUR DREAM BATHROOM RENOVATION
This entire process will take 2 weeks.
- STEP 1: Removal of all existing fixtures in your current bathroom.
- STEP 2: Plumber & Electrician commence a preliminary preparation for plumbing and electrical fixtures.
- STEP 3: Gyprocker will resheet your walls with villaboard and gyprock your ceilings.
- STEP 4: Waterproofing is now done in the shower recess with Bostik Polyurethane using a 50mm x 50mm aluminium angle for hob.
- STEP 5: Wall & Floor tiling will now commence and take 4-5 days.
- STEP 6: Plumber and Electrician will complete their work.
- STEP 7: Shower screen and all bathroom accessories will be installed.
- STEP 8: Tiles will be polished and bath and shower siliconed.
- STEP 9: Bathroom is checked to ensure all areas are working and in good order.
- STEP 10: Bathroom is cleaned and polished ready for your inspection.